Residential Drainage Specifications & Hydraulic Calculators

Sizing tools, trench and pipe specifications, seepage diagnostics, and pre-backfill inspection checklists for US yard drainage, lot grading, roof runoff piping, sump pumps, and foundation water control.

Hydraulic calculators

French drain trench cross-sectionTrench widthGeotextile wrapPipe OD

French Drain Gravel and Material Calculator

Calculate net French drain gravel in cubic yards after deducting pipe outside diameter, apply supplier bulk density and optional order allowances for US short tons, and estimate width-aware fabric rolls.

Estimate French drain gravel
Sump basin and discharge liftStatic liftBasin IDDischarge pipe

Sump Pump Sizing, TDH, and Battery Backup Calculator

Estimate sump inflow from a timed water rise, generate Total Dynamic Head (TDH) checkpoints for pump curves, and compare selected battery runtime separately from inflow-matching runtime.

Check sump GPM & backup hours
Foundation grading and fallHorizontal runDropFoundationFall away from wall

Yard Slope and Grading Calculator

Calculate yard slope & pipe fall
Roof runoff into gravity pipeProjected roof areaDownspoutPipe ID / slope

Roof Runoff and Downspout Pipe Sizing Calculator

Size roof runoff & drain pipe
Driveway culvert cross-section showing cover over the crown and inside diameterDriveway surfaceCoverIDCompacted beddingCulvert barrel

Driveway Culvert Sizing and Cover Calculator

Check culvert flow & cover
Roof gutter and downspout cross-section showing trough width and outletRoof pitch / runoffTrough widthGutter profileDrop outlet

Roof Gutter Width and Downspout Count Calculator

Size roof gutters & downspouts
Catch basin cross-section showing ponding head, grate openings and outlet pipePonding headGrate openingsBasinOutlet pipe

Catch Basin Grate Flow and Basin Count Calculator

Size catch basin grates & pipe
Rain garden cross-section showing surface ponding, footprint and bottom infiltrationRunoffDepthFootprintBottom infiltrationOverflow lip

Rain Garden Sizing and Infiltration Calculator

Size rain garden footprint
Dry well storage and infiltrationStorage volumeNet voidsInfiltration area

Dry Well Sizing and Infiltration Calculator

Calculate dry well storage & drain-down

Diagnose a water problem

Browse all 135 diagnostic guides

Identify how water or moisture is entering a basement or residential foundation and determine whether drainage correction, waterproofing, or structural evaluation is the appropriate next step.

Water at the Basement Wall-Floor Joint After Rain

Identify why an outdoor residential soil-covered area remains wet or flooded and determine whether grading, soil behavior, groundwater, incoming runoff, or an existing yard drainage component is responsible.

Standing Water on a Flat Yard With No Natural Slope

Identify why an existing residential sump pumping system is failing to start, stop, discharge water, or maintain a safe basin water level.

Sump Pump Won't Turn On When Basin Fills

Determine whether an existing roof-runoff conveyance failure originates at the gutter, downspout, gravity-fed buried pipe, connection, or outlet.

Buried Downspout Drain Clogged or Backing Up

Determine why an installed exterior French drain is failing to intercept, collect, convey, or discharge water.

French Drain Clogged With Silt, Clay, or Sediment

Distinguish bulk-water intrusion, groundwater, vapor transmission, condensation, and failed moisture-control measures in an existing residential crawl space.

Condensation on Crawl Space Joists, Subfloor, and Ductwork

Compare drainage systems & materials

Browse all 87 comparisons

French Drain vs. Catch Basin

Use a catch basin to capture ponded surface runoff rapidly at a low spot, a French drain to intercept slow subsurface groundwater across saturated soil, and both on separate or properly valved solid-plus-perforated lines when surface ponding and high soil saturation occur together.

Buried Downspout Drain vs. French Drain

Route roof runoff exclusively through a solid-wall buried downspout drain rather than a perforated French drain, reserving perforated French drains for intercepting diffuse soil moisture on a separate pipe.

French Drain vs. Channel Drain

Choose a channel drain to intercept fast sheet flow across or along paved driveways, patios, and garage aprons, and a French drain in adjacent unpaved soil only when subsurface lateral seepage rather than surface runoff is the primary load.

Rain Garden vs. Dry Well: Which On-Site Infiltration System Fits Your Lot?

Choose a rain garden when open sunlit yard space and gentle surface inflow allow shallow vegetated ponding and evapotranspiration, and choose a dry well when lawn area is constrained and piped roof runoff must infiltrate underground.

Driveway Culvert vs. Trench Drain: Routing Ditch Flow Under or Sheet Flow Across?

Install a driveway culvert to pass concentrated roadside ditch or swale flow underneath a driveway crossing, and install a grated trench drain across the slab to intercept sheet runoff flowing down sloped pavement toward a garage or street.

Battery Backup vs. Water-Powered Backup Sump Pumps

Choose a battery backup system on private well water or for higher pumping capacity during short-to-medium outages, and choose a water-powered backup only when reliable high-pressure municipal water and approved backflow protection are present.

Interior Foundation Crack Injection vs. Exterior Waterproofing

Injection may suit a stable, isolated crack in poured concrete. If water enters at the wall-floor joint or across porous masonry, check surface drainage first, then compare interior perimeter drainage and exterior excavation.

Reinforced Concrete Pipe (RCP) vs. Dual-Wall HDPE Driveway Culverts

Choose precast reinforced concrete pipe when minimal cover depth, heavy delivery axle loads, or high flotation risk govern the ditch crossing, and choose dual-wall HDPE for lighter residential handling and tighter joint seals.

Unified hydraulic constants & reference tables

All 13 reference tables

Engineering reference directories

Structure & water intrusion

Site grading & conveyance

Sizing, comparisons & scope